MBtekUNI 60 Docs
3 · Installation

Positioning the boiler

Unpack, move and set the UNI 60 in place — floor, levelling, clearances and the flue connection, before any pipework or wiring begins.

Updated

Set the boiler in its final position, level, on a non-combustible floor, with the clearances already marked out — everything after this step is much harder to correct. The UNI 60 weighs 1,224 lb and must stay upright the whole way in.

Qualified trades only

The boiler must be connected according to a project developed by a specialist in hydronic heating systems, with the requisite qualification and experience. Electrical work requires a qualified electrician.

Before you move it

Confirm the room is ready

Clearances marked, floor rated and level, ventilation openings clear, chimney installed or at least positioned. See Boiler room and clearances.

Complete the delivery inspection

Damage and missing items must be recorded before the delivery is accepted. See What's in the box.

Check the route

30 in wide, 36 in deep, 65 in tall, ±5 %. Doorways, corners, stair widths and floor protection along the whole route.

Setting the boiler

Keep it vertical

Transport and handling must keep the boiler in the vertical position only. Loading and securing must ensure complete safety against mechanical damage.

Position on a non-combustible floor

Set the boiler on its supports on a level, load-rated, non-combustible floor.

Level it, then check the rear incline

Level the body. The clearance drawing calls for a minimum incline of 3° at the back wall reference — this is the allowance for the flue connection run, not a tilt of the boiler itself.

Verify final clearances

With the boiler in place, re-measure: 24 in back and sides, 36 in front, 28 in overhead, 12 in to combustibles.

Fit the ash pan

The ash pan goes outside the unit, at the front of the ash door — not inside the boiler.

Identify the connections

Sectional drawing of the UNI boiler with numbered callouts for the supply and return pipe connections, drain pipe, temperature sensor well, fan and controller
Locate these before piping: 11 supply pipe connection, 12 return pipe connection, 13 drain pipe, 14 temperature sensor well, 4 chimney connection, 15 fan, 16 controller. Source: UNI Boiler Manual §6.0.
CalloutConnectionUNI 60 size
11Supply pipe2 in
12Return pipe2 in
13Drain pipe
14Temperature sensor wellBoiler (CH) sensor + STB
4Chimney connection8 in

Connect the flue

Match the diameter

The chimney diameter must not be less than the diameter of the flue outlet — 8 in for the UNI 60.

Keep the run short and straight

Use as few bends as possible. Each one costs draft.

Respect the pipe clearance

12 in from the exhaust pipe to combustible material, or 6 in for double-wall stove exhaust pipe.

Seal and support

The connecting pipe must be supported independently of the boiler, and joints sealed. Acidic condensate attacks joints over time — see Chimney care.

NextHydronic piping

Supply, return, relief valve, drain and return-temperature protection.

On this page